Dwelling Subsea Collaboration center opens in Glasgow for Scotland-England subsea inexperienced electricity superhighways
November 8, 2024,
by
Nadja Skopljak
A brand original collaboration center that can direct together around 80 inexperienced energy workers contributing to the provide of a assortment of subsea electricity transmission links between Scotland and England has been formally opened in Glasgow, Scotland.
The Jap Green Hyperlink (EGL) Collaboration Centre will direct together workers from the SSEN Transmission and National Grid Electrical energy Transmission joint enterprise (JV), moreover the provide chain companions they’ve appointed, to direct the EGL assortment of electricity transmission subsea superhighways, starting with EGL2, whose building started in September.
-
Posted: about 1 month ago
“EGL2 and EGL3 are two major projects that we’re working to direct at SSEN Transmission as section of our £20bn ‘Pathway to 2030’ investment programme to abet fabricate the energy security and earn zero dreams of Scotland and the UK,” said Rob McDonald, SSEN Transmission’s Managing Director.
“Having a dedicated place of job position within the centre of Glasgow for the EGL pipeline of subsea projects will judge the central belt, moreover the north and north east of Scotland, benefitting economically from the provide of this major original infrastructure.”
Opened by Glasgow North MP, Martin Rhodes, nowadays, November 8, the flexibility involves a Efficiency Centre which makes impart of lowering-edge know-how to drive efficiency, a dedicated position for provide chain companions to collaborate, and a position where every transmission operators can come together.
“This collaboration centre is National Grid’s first bricks and mortar presence in Glasgow, and we are joyful to even be rising our presence across our other joint ventures in Scotland which capacity that of the dimensions and scale of our projects,” said Carl Trowell, National Grid Electrical energy Transmission’s President for UK Strategic Infrastructure.
“National Grid is investing £30bn within the UK over the subsequent five years; a transformational step up in orderly energy infrastructure investment, unparalleled in its scale and ambition. This investment is a stimulus for financial growth and will give a elevate to 55,000 more UK jobs by the waste of the decade, while also accelerating the decarbonisation of the energy plot for the digital, electrified economies of the long spin.”
-
Posted: 2 days ago
Per SSEN Transmission, EGL2 and EGL3 will most certainly be the most attention-grabbing electricity transmission projects ever delivered within the UK and will play a essential position in helping Scotland and the UK to fulfill energy security and orderly energy targets.
Four EGL links fabricate section of planned electricity grid reinforcements to develop the aptitude of the present UK transmission community and facilitate elevated flows of planned renewable know-how within the North to ask centers to the South, supporting the ambition of enabling 50 GW of offshore wind know-how by 2030 and reaching a earn-zero financial system by 2050.
Comply with Offshore Energy’s Subsea on social media: